MCDYLAN

Projects

System capability,
proven in real conditions.

The projects below cover bathhouses, livestock, greenhouses, hotels, guesthouses and campuses. We do not disclose client-sensitive information, but we can arrange visits to comparable projects.

Northwest low temperatureNorth China coal-to-electricityCommercial hot waterCampus heating

Project list

Six delivered projects,
six different load profiles.

Case information comes from company project records. At client request, some projects do not disclose detailed addresses or scale.

Pingliang, Gansu

Bathhouse · Commercial hot water system

High-volume continuous supply, with tanks and units sized to the peak-and-off-peak water curve, running stably in low winter temperatures.

Linfen, Shanxi

Pig farm · Livestock heating

Zoned temperature control in livestock housing that balances ventilation and energy use, reducing the impact of winter cold on production.

Tianjin

Vegetable growing · Greenhouse heating

Winter production in greenhouses with even heat distribution at the terminals and coordinated insulation and ventilation management.

Kaifeng, Henan

Xingxing Hotel · Heating, cooling and hot water

Room heating and cooling designed together with domestic hot water, with central plant room control to simplify operation and maintenance.

Kaifeng, Henan

Beigang guesthouse · Heating, cooling and hot water

A combined heating, cooling and hot water solution for a small guesthouse, balancing comfort against initial investment.

Shanxi

Vocational college · Campus heating

Separate heating zones for teaching areas and dormitories, with time-based control by schedule to balance comfort and energy saving.

Visits to comparable projects, online or on site, can be arranged. Specific project names and scale are confirmed in discussion with us.

Delivery standards

Installed to standard,
or there is no reputation to discuss.

Heat pumps are three parts equipment and seven parts installation. We treat installation standards, commissioning records and acceptance criteria as part of delivery, not something to remember after a breakdown.

Technicians installing and commissioning an air source heat pump on siteOn-site installation and commissioning

Partner enquiry

Turn your city
into a business that lasts.

From territory assessment to first delivery, MCDYLAN walks you through the first 90 days with a repeatable method.

What you receive after applying:

  • A short read on local market size and competitor structure
  • A breakdown of partnership models and start-up costs
  • Sample machine, showroom and training policies